Marion County Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
103 (g) Written Notification Hazard Complaint Inspectio
3.0 on-site hours reported
Other safeguards.
30 CFR 75.1403 · $642.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $288.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $288.00 proposed penalty
Spot Inspections
103(i) · 7.5 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $288.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $642.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $288.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $465.00 proposed penalty
Spot Inspections
103(i) · 7.0 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
9.0 on-site hours reported
Criteria—Self-propelled personnel carriers.
30 CFR 75.1403-6(b)(3) · $151.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
30 CFR 75.1714-3(b) · $366.00 proposed penalty
Machinery
No dys awy frm wrk,no rstr act
Accident narrative
Injured operating fletcher center bolter in motor barn rehab area between #3 and #4 seal installing a bolt in a bacon strap and had left hand resting on drill mast. As mast went up it pinched the tip of EE's middle finger in the mast resulting in a crushing injury that required 6 sutures to close the wound. No problems with equipment or compliance issues, training or PPE.
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · $366.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $504.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $209.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $504.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $226.00 proposed penalty
Criteria—Self-propelled personnel carriers.
30 CFR 75.1403-6(b)(3) · $151.00 proposed penalty
Spot Inspections
103(i) · 9.0 on-site hours reported
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $1,818.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $504.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.