Marion County Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $313.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $398.00 proposed penalty
Ventilation Technical Investigation
34.0 on-site hours reported
Regular Safety and Health Inspection
675.0 on-site hours reported
Fall of roof or back
No dys awy frm wrk,no rstr act
Accident narrative
Injured installing rib bolt while cutting turn 3-2 at 115 block 9 North when a piece of the rock brow fell out and struck EE's left shin resulting in a laceration that required 9 sutures to close. No problems with equipment or compliance issues, training or PPE.
Powered haulage
Days away from work only
Accident narrative
Employee pulling a power car in 7 West 3 left 3 block intersection by hooking a chain up between the power car and a scoop. They had scoop back up to take slack out of the chain and it failed immediately, throwing a link that struck them in the forehead resulting in 3 lacerations that required 6 sutures total to close. No problems with equipment issues, training or PPE.
Spot Inspection
4.3 on-site hours reported
Spot Inspection
5.0 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Spot Inspections
103(i) · 3.8 on-site hours reported
Spot Inspections
103(i) · 7.0 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $336.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $465.00 proposed penalty
Entrapment
Accident only
Accident narrative
At approximately 8:03am the bracket holding the top counter weight wheel failed and a piece of the bracket fell and damaged a sensor on the bottom of the sugar run elevator causing 3 miners to become entrapped on the elevator. The miners were safely removed from the elevator at 9:33am. No problems with equipment or compliance issues, training or PPE.
Spot Inspections
103(i) · 4.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $288.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $432.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
30 CFR 75.1714-3(b) · $465.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Injured employee was picking up a slope chain and placing it on the slope car when they felt a pain in their back. It did not involve any equipment or compliance issues. It also did not involve job skills, proficiency, training, PPE or protective devices.
Spot Inspections
103(i) · 7.5 on-site hours reported
Verbal Hazard Complaint Inspections
1.0 on-site hours reported
Shaft, Slope or Major Construction Spot Inspection
4.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.