← Marion County Mine

Marion County Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Other safeguards.

    violationRecord 9939443

    30 CFR 75.1403 · $465.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 8048587

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  3. Other safeguards.

    violationRecord 8048586

    30 CFR 75.1403 · $465.00 proposed penalty

  4. Verbal Hazard Complaint Inspections

    inspectionRecord F019987

    10.8 on-site hours reported

  5. Verbal Hazard Complaint Inspections

    inspectionRecord F019986

    4.8 on-site hours reported

  6. Accumulation of combustible materials.

    violationRecord 8048584

    30 CFR 75.400 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 8048583

    30 CFR 75.400 · $549.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 8048582

    30 CFR 75.400 · $549.00 proposed penalty

  9. Other safeguards.

    violationRecord 8048581

    30 CFR 75.1403 · $313.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 9939442

    30 CFR 75.400 · $549.00 proposed penalty

  11. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9582540

    30 CFR 75.1731(b) · $151.00 proposed penalty

  12. Protection from falls of roof, face and ribs.

    violationRecord 9582539

    30 CFR 75.202(a) · $226.00 proposed penalty

  13. Verbal Hazard Complaint Inspections

    inspectionRecord F019984

    1.8 on-site hours reported

  14. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F019985

    7.0 on-site hours reported

  15. Loading and haulage equipment; operation.

    violationRecord 9582538

    30 CFR 77.1607(i) · $818.00 proposed penalty

  16. Dust accumulations in surface installations.

    violationRecord 9582537

    30 CFR 77.202 · $151.00 proposed penalty

  17. Travelways at surface installations.

    violationRecord 9582536

    30 CFR 77.205(a) · $151.00 proposed penalty

  18. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F019983

    9.8 on-site hours reported

  19. Ventilation controls.

    violationRecord 9939441

    30 CFR 75.333(d)(3) · $151.00 proposed penalty

  20. Protection from falls of roof, face and ribs.

    violationRecord 9935319

    30 CFR 75.202(a) · $288.00 proposed penalty

  21. Verbal Hazard Complaint Inspections

    inspectionRecord F0407E5

    2.3 on-site hours reported

  22. Other safeguards.

    violationRecord 9090007

    30 CFR 75.1403 · $288.00 proposed penalty

  23. Weekly examination.

    violationRecord 9584959

    30 CFR 75.364(b)(1) · $151.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 9935318

    30 CFR 75.370(a)(1) · $313.00 proposed penalty

  25. Other safeguards.

    violationRecord 9090012

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,431.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.