  1. Inspection.

    violationRecord 5176790

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  2. Inspection.

    violationRecord 5176789

    30 CFR 56.4201(a) · $151.00 proposed penalty

  3. Splices and repairs of power cables.

    violationRecord 5176788

    30 CFR 56.12013(b) · $313.00 proposed penalty

  4. Horns and backup alarms.

    violationRecord 5176787

    30 CFR 56.14132(b)(1)(i) · Significant and substantial (S&S) · $465.00 proposed penalty

  5. Protective equipment or clothing for welding, cutting, or working with molten metal.

    violationRecord 5176786

    30 CFR 56.15007 · Significant and substantial (S&S) · $697.00 proposed penalty

  6. Horns and backup alarms.

    violationRecord 5176785

    30 CFR 56.14132(b)(1)(i) · $151.00 proposed penalty

  7. Construction and maintenance of guards.

    violationRecord 5176784

    30 CFR 56.14112(b) · $151.00 proposed penalty

  8. Moving machine parts.

    violationRecord 5176783

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $697.00 proposed penalty

  9. Housekeeping.

    violationRecord 5176782

    30 CFR 56.20003(a) · $151.00 proposed penalty

  10. Machinery, equipment, and tools.

    violationRecord 5176781

    30 CFR 56.14205 · Significant and substantial (S&S) · $465.00 proposed penalty

  11. Protection for openings around travelways.

    violationRecord 5176780

    30 CFR 56.11012 · $151.00 proposed penalty

  12. Inspection.

    violationRecord 5176779

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  13. Operators stations.

    violationRecord 5176778

    30 CFR 56.14103(b) · Significant and substantial (S&S) · $336.00 proposed penalty

  14. Safety defects; examination, correction and records.

    violationRecord 5176777

    30 CFR 56.14100(c) · $151.00 proposed penalty

  15. Inspection.

    violationRecord 5176776

    30 CFR 56.4201(a)(1) · $151.00 proposed penalty

  16. Machinery, equipment, and tools.

    violationRecord 5176775

    30 CFR 56.14205 · $151.00 proposed penalty

  17. New task training.

    violationRecord 5176774

    30 CFR 46.7(a) · $320.00 proposed penalty

  18. Activity between machinery or equipment and the highwall or bank.

    violationRecord 5176773

    30 CFR 56.3430 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  19. Regular Safety and Health Inspection

    inspectionRecord F0367B8

    39.3 on-site hours reported

  20. Safety defects; examination, correction and records.

    violationRecord 5176635

    30 CFR 56.14100(c) · Significant and substantial (S&S) · $697.00 proposed penalty

  21. Electrical conductors.

    violationRecord 5176634

    30 CFR 56.12004 · $313.00 proposed penalty

  22. Safety defects; examination, correction and records.

    violationRecord 5173427

    30 CFR 56.14100(c) · Significant and substantial (S&S) · $465.00 proposed penalty

  23. Safety can use.

    violationRecord 5173426

    30 CFR 56.4402 · $151.00 proposed penalty

  24. New task training.

    violationRecord 5176633

    30 CFR 46.7(a) · $168.00 proposed penalty

  25. Housekeeping.

    violationRecord 5173425

    30 CFR 56.20003(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.