Safety activity
Action level.
30 CFR 62.120
Spot Inspection
13.0 on-site hours reported
Berms or guardrails.
30 CFR 57.9300(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Construction and maintenance of guards.
30 CFR 57.14112(b) · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(c) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Regular Safety and Health Inspection
42.0 on-site hours reported
Construction and maintenance of guards.
30 CFR 57.14112(a)(2) · $151.00 proposed penalty
Regular Safety and Health Inspection
28.0 on-site hours reported
Correction of hazardous conditions.
30 CFR 57.3200 · $267.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts for surface equipment.
30 CFR 57.14130(g) · Significant and substantial (S&S) · $592.00 proposed penalty
General requirements.
30 CFR 57.4200(b)(2) · $151.00 proposed penalty
Handrails and toeboards.
30 CFR 57.11002 · $151.00 proposed penalty
Handrails and toeboards.
30 CFR 57.11002 · $151.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $151.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $151.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $151.00 proposed penalty
Grounding circuit enclosures.
30 CFR 57.12025 · $151.00 proposed penalty
Requirement for container labels.
30 CFR 47.41(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
45.0 on-site hours reported
Operators' stations.
30 CFR 57.14103(b) · $151.00 proposed penalty
Safe access.
30 CFR 57.11001 · $313.00 proposed penalty
Electrical conductors.
30 CFR 57.12004 · $151.00 proposed penalty
Illumination of surface working areas.
30 CFR 57.17001 · $313.00 proposed penalty
Regular Safety and Health Inspection
31.0 on-site hours reported
Requirement for container labels.
30 CFR 47.41(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.