← MAPLE SPRINGS MINE

MAPLE SPRINGS MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Mechanical equipment guards.

    violationRecord 5153189

    30 CFR 77.400(a)

  2. Water sprinkler systems; arrangement of sprinklers.

    violationRecord 5153188

    30 CFR 75.1101-8(a)

  3. Temporary, portable containers.

    violationRecord 5153187

    30 CFR 47.44(b)

  4. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 5153186

    30 CFR 75.1600-2(e)

  5. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5153185

    30 CFR 75.1731(a)

  6. Violation — cited standard not reported

    violationRecord 5153184
  7. Identification check system.

    violationRecord 5153183

    30 CFR 75.1715

  8. Regular Safety and Health Inspection

    inspectionRecord 6245856

    61.3 on-site hours reported

  9. Health Technical Investigation

    inspectionRecord F028F96

    5.0 on-site hours reported

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5152484

    30 CFR 75.1731(b) · $151.00 proposed penalty

  11. Mechanical equipment guards.

    violationRecord 5152483

    30 CFR 75.1722(c) · $245.00 proposed penalty

  12. Inspection of fire suppression devices.

    violationRecord 5152482

    30 CFR 75.1107-16(a) · $245.00 proposed penalty

  13. Water sprinkler systems; arrangement of sprinklers.

    violationRecord 5152481

    30 CFR 75.1101-8(d) · $151.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 5152480

    30 CFR 75.400 · $151.00 proposed penalty

  15. Power wires and cables; insulation and protection.

    violationRecord 5152479

    30 CFR 75.517 · Significant and substantial (S&S) · $549.00 proposed penalty

  16. Machinery and equipment; operation and maintenance.

    violationRecord 5152478

    30 CFR 75.1725(a) · $151.00 proposed penalty

  17. Roof control plan.

    violationRecord 5152477

    30 CFR 75.220(a)(1) · $267.00 proposed penalty

  18. Power wires and cables; insulation and protection.

    violationRecord 5152476

    30 CFR 75.517 · Significant and substantial (S&S) · $549.00 proposed penalty

  19. Electrical Technical Investigation

    inspectionRecord 4012018

    14.0 on-site hours reported

  20. Ventilation Technical Investigation

    inspectionRecord F037F56

    13.0 on-site hours reported

  21. Regular Safety and Health Inspection

    inspectionRecord F00F4B9

    90.5 on-site hours reported

  22. Ventilation controls.

    violationRecord 5152470

    30 CFR 75.333(h) · $151.00 proposed penalty

  23. Ventilation controls.

    violationRecord 5152469

    30 CFR 75.333(c)(2) · $151.00 proposed penalty

  24. Roof Control Technical Investigation

    inspectionRecord F00BB60

    7.5 on-site hours reported

  25. Travelways at surface installations.

    violationRecord 5152466

    30 CFR 77.205(e) · Significant and substantial (S&S) · $642.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.