  1. Maintenance of incombustible content of rock dust.

    violationRecord 5029099

    30 CFR 75.403 · $592.00 proposed penalty

  2. Maintenance of incombustible content of rock dust.

    violationRecord 5029098

    30 CFR 75.403 · $592.00 proposed penalty

  3. Other safeguards.

    violationRecord 5029097

    30 CFR 75.1403 · $883.00 proposed penalty

  4. Other safeguards.

    violationRecord 5029096

    30 CFR 75.1403 · $883.00 proposed penalty

  5. Mine ventilation plan; submission and approval.

    violationRecord 5029960

    30 CFR 75.370(a)(1) · $1,126.00 proposed penalty

  6. Verbal Hazard Complaint Inspections

    inspectionRecord F014275

    13.5 on-site hours reported

  7. Mine ventilation plan; submission and approval.

    violationRecord 5029959

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  8. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F015B59

    2.5 on-site hours reported

  9. Electric equipment; examination, testing and maintenance.

    violationRecord 5029958

    30 CFR 75.512 · $288.00 proposed penalty

  10. Escapeways; bituminous and lignite mines.

    violationRecord 5029095

    30 CFR 75.380(d)(7)(vii)(A) · $4,749.00 proposed penalty

  11. Escapeways; bituminous and lignite mines.

    violationRecord 5029094

    30 CFR 75.380(d)(4) · $1,219.00 proposed penalty

  12. Installation of high-voltage transmission cables.

    violationRecord 5029093

    30 CFR 75.807 · $549.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5029957

    30 CFR 75.400 · $1,037.00 proposed penalty

  14. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5029956

    30 CFR 75.1731(a) · $267.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5029955

    30 CFR 75.400 · $465.00 proposed penalty

  16. Ventilation controls.

    violationRecord 5029954

    30 CFR 75.333(e)(1)(ii) · $165.00 proposed penalty

  17. Approved sampling devices; operation; air flowrate.

    violationRecord 5029092

    30 CFR 70.205(c) · $151.00 proposed penalty

  18. Electric equipment; examination, testing and maintenance.

    violationRecord 5029091

    30 CFR 75.512 · $288.00 proposed penalty

  19. Mechanical equipment guards.

    violationRecord 5029090

    30 CFR 75.1722(a) · $245.00 proposed penalty

  20. Mechanical equipment guards.

    violationRecord 5029089

    30 CFR 75.1722(a) · $366.00 proposed penalty

  21. Other safeguards.

    violationRecord 5029088

    30 CFR 75.1403 · $883.00 proposed penalty

  22. Other safeguards.

    violationRecord 5029087

    30 CFR 75.1403 · $592.00 proposed penalty

  23. Weekly examination.

    violationRecord 5029086

    30 CFR 75.364(b)(2) · $165.00 proposed penalty

  24. Weekly examination.

    violationRecord 5029953

    30 CFR 75.364(g) · $151.00 proposed penalty

  25. Mine ventilation plan; submission and approval.

    violationRecord 5029952

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.