← Maple Eagle No. 1 Mine

Maple Eagle No. 1 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Other safeguards.

    violationRecord 5022978

    30 CFR 75.1403 · $5,574.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5022977

    30 CFR 75.400 · $755.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5022976

    30 CFR 75.370(a)(1) · $1,818.00 proposed penalty

  4. Other safeguards.

    violationRecord 5022975

    30 CFR 75.1403 · $1,431.00 proposed penalty

  5. Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities.

    violationRecord 5022974

    30 CFR 75.1712-3(c)(2)(iv) · $818.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 5029119

    30 CFR 75.370(a)(1) · $1,818.00 proposed penalty

  7. Mine ventilation plan; submission and approval.

    violationRecord 5029118

    30 CFR 75.370(a)(1) · $6,037.00 proposed penalty

  8. Other safeguards.

    violationRecord 5029117

    30 CFR 75.1403 · $2,133.00 proposed penalty

  9. Emergency tethers.

    violationRecord 5029116

    30 CFR 75.1714-6 · $818.00 proposed penalty

  10. Protection of trailing cables.

    violationRecord 5022973

    30 CFR 75.606 · $245.00 proposed penalty

  11. Electric equipment; examination, testing and maintenance.

    violationRecord 5022972

    30 CFR 75.512 · $465.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 5022971

    30 CFR 75.503 · $432.00 proposed penalty

  13. Other safeguards.

    violationRecord 5022970

    30 CFR 75.1403 · $642.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5022969

    30 CFR 75.370(a)(1) · $1,818.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 5022968

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 5022967

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  17. Roof control plan.

    violationRecord 9847590

    30 CFR 75.220(a)(1) · $1,550.00 proposed penalty

  18. Preshift examination at fixed intervals.

    violationRecord 5029113

    30 CFR 75.360(g) · $151.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5022966

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  20. Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities.

    violationRecord 5022965

    30 CFR 75.1712-3(b) · $1,219.00 proposed penalty

  21. Other safeguards.

    violationRecord 5029112

    30 CFR 75.1403 · $883.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 5029111

    30 CFR 75.400 · $432.00 proposed penalty

  23. Other safeguards.

    violationRecord 5029110

    30 CFR 75.1403 · $398.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 5029109

    30 CFR 75.400 · $432.00 proposed penalty

  25. Other safeguards.

    violationRecord 5029108

    30 CFR 75.1403 · $398.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.