← Maple Eagle No. 1 Mine

Maple Eagle No. 1 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 5186328

    30 CFR 75.400 · $1,679.00 proposed penalty

  2. Water spray devices; capacity; water supply; minimum requirements.

    violationRecord 5022993

    30 CFR 75.1107-7(a) · $245.00 proposed penalty

  3. Mine map.

    violationRecord 5186327

    30 CFR 75.1200 · $245.00 proposed penalty

  4. Mine ventilation plan; submission and approval.

    violationRecord 5186326

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  5. Mine ventilation plan; submission and approval.

    violationRecord 5022992

    30 CFR 75.370(a)(1) · $3,448.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 5186325

    30 CFR 75.400 · $1,679.00 proposed penalty

  7. Mine ventilation plan; submission and approval.

    violationRecord 5186324

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  8. Other safeguards.

    violationRecord 5186323

    30 CFR 75.1403 · $1,431.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 5186322

    30 CFR 75.370(a)(2) · $245.00 proposed penalty

  10. Other safeguards.

    violationRecord 5186321

    30 CFR 75.1403 · $5,574.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 5022991

    30 CFR 75.400 · $755.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 5022990

    30 CFR 75.503 · Significant and substantial (S&S) · $7,084.00 proposed penalty

  13. Condition and examination of firefighting equipment.

    violationRecord 5022989

    30 CFR 75.1100-3 · $245.00 proposed penalty

  14. Other safeguards.

    violationRecord 5022988

    30 CFR 75.1403 · $642.00 proposed penalty

  15. Protection from falls of roof, face and ribs.

    violationRecord 5022987

    30 CFR 75.202(a) · $1,037.00 proposed penalty

  16. Other safeguards.

    violationRecord 5022986

    30 CFR 75.1403 · $1,431.00 proposed penalty

  17. Other safeguards.

    violationRecord 5022985

    30 CFR 75.1403 · $642.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5022984

    30 CFR 75.370(a)(1) · $1,968.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5022983

    30 CFR 75.370(a)(1) · $1,818.00 proposed penalty

  20. Quarterly sampling; mechanized mining units.

    violationRecord 5027624

    30 CFR 70.208(a)(2) · $1,219.00 proposed penalty

  21. Quarterly sampling; mechanized mining units.

    violationRecord 5027623

    30 CFR 70.208(a)(2) · $1,219.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 5022982

    30 CFR 75.400 · $5,574.00 proposed penalty

  23. Ventilation controls.

    violationRecord 5022981

    30 CFR 75.333(h) · $755.00 proposed penalty

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5022980

    30 CFR 75.1731(a) · $959.00 proposed penalty

  25. Other safeguards.

    violationRecord 5022979

    30 CFR 75.1403 · $642.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.