Slip or fall of person
Days away from work only
Accident narrative
EE was shoveling at a v-plow on the #10 Belt when EE slipped resulting in straining EE's hamstring. EE was placed off work on 5/28/2025 after seeing a specialist that diagnosed EE with two torn tendons in the hamstring.
Weekly examination.
30 CFR 75.364(b)(2) · $755.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $193.00 proposed penalty
Weekly examination.
30 CFR 75.364(b)(2) · $226.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $697.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $697.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S) · $883.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(i) · $151.00 proposed penalty
Cable fittings; suitability.
30 CFR 75.515 · $755.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $883.00 proposed penalty
Air quality.
30 CFR 75.321(a)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $465.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $288.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $209.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $642.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $465.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $465.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $432.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $465.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $193.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.