Maple Eagle No. 1 Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Ventilation controls.
30 CFR 75.333(c)(3) · $151.00 proposed penalty
Handtools (nonpowered)
No dys awy frm wrk,no rstr act
Accident narrative
Employee reported that their eye was irritated after making a cable splice. Employee was unable to identify the mechanism of injury, but was diagnosed with having a foreign object in their eye that was removed in an outpatient surgery.
Other safeguards.
30 CFR 75.1403 · $465.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $697.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(6) · $336.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty
Escapeway maps.
30 CFR 75.1505(b) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vii)(B) · $336.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,431.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $1,550.00 proposed penalty
Ventilation controls.
30 CFR 75.333(d)(2) · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,431.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $209.00 proposed penalty
Verbal Hazard Complaint Inspections
10.0 on-site hours reported
Installation of water sprinkler systems; requirements.
30 CFR 75.1101-7(a) · $1,126.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,818.00 proposed penalty
Storage of materials.
30 CFR 77.208(e) · $755.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $465.00 proposed penalty
Inspection of fire suppression devices.
30 CFR 75.1107-16(b) · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(b) · $226.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $11,450.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $592.00 proposed penalty
Mine map.
30 CFR 75.1200(c) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.