Maple Eagle No. 1 Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Construction and repair of seals.
30 CFR 75.337(a) · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $432.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
EE was attempting to lift a timber to be placed in a scoop, EE felt a sharp pain in EE's back.
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Temporary notations, revisions, and supplements.
30 CFR 75.1202 · $151.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
30 CFR 75.1714-3(a) · $151.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Employee was carrying a 40lb. bag of B-Bond to place on a scoop, their feet got tangled in a banding strap and they fell twisting a knee. Employee worked next scheduled shift then returned to a specialist on 6/2/2025 where they were diagnosed with a torn meniscus.
Travelways at surface installations.
30 CFR 77.205(a) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $336.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iv) · $226.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $151.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $209.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $193.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S) · $4,383.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(4)(iii) · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $398.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(b)(4) · $755.00 proposed penalty
Temporary notations, revisions, and supplements.
30 CFR 75.1202-1(b)(3) · $151.00 proposed penalty
Protection of trailing cables.
30 CFR 75.606 · $336.00 proposed penalty
Identification of circuit breakers.
30 CFR 75.904 · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $465.00 proposed penalty
Identification of circuit breakers.
30 CFR 75.904 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.