Maple Eagle No. 1 Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Roof bolting.
30 CFR 75.204(c)(1) · $267.00 proposed penalty
Approval of other fire suppression devices.
30 CFR 75.1107-13(g) · $177.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $642.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · $165.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $288.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $642.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $642.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $642.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · $1,818.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $398.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $465.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(2) · $1,037.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $2,503.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · $1,550.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $818.00 proposed penalty
Changes in electric system map; recording.
30 CFR 75.508-2 · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $193.00 proposed penalty
Roof testing and scaling.
30 CFR 75.211(d) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $755.00 proposed penalty
On-shift examination.
30 CFR 75.362(a)(1) · $1,037.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(b) · $2,312.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $3,184.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(b) · $209.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $2,503.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.