Maple Eagle No. 1 Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1)
Power wires and cables; insulation and protection.
30 CFR 75.517
Accumulation of combustible materials.
30 CFR 75.400
Permissible electric face equipment; maintenance.
30 CFR 75.503
Regular Safety and Health Inspection
54.0 on-site hours reported
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S)
Escapeway maps.
30 CFR 75.1505(b)
Communications facilities; refuge alternatives.
30 CFR 75.1600-3(a)(1)
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1)
Handling of materials
No dys awy frm wrk,no rstr act
Accident narrative
Employee was struck by a joint of water line causing a laceration that required 4 stitches in their right leg.
Non-Injury Accident Investigation
17.8 on-site hours reported
Spot Inspection
4.0 on-site hours reported
Violation — cited standard not reported
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $1,679.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(2) · $504.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,550.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(2) · $504.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,431.00 proposed penalty
Handling of materials
No dys awy frm wrk,no rstr act
Accident narrative
EE was struck in the back by a falling timber, then fell forward into a scoop bucket. EE's face struck the scoop bucket. EE is off work awaiting an appointment with a specialist for a fracture in EE's lumbar spine.
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $504.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $1,037.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(f) · $336.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $465.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $465.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $1,219.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.