  1. Methane monitors.

    violationRecord 5186380

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  2. Protection of trailing cables.

    violationRecord 5183758

    30 CFR 75.606 · $151.00 proposed penalty

  3. Power wires and cables; insulation and protection.

    violationRecord 5183757

    30 CFR 75.517 · $151.00 proposed penalty

  4. Mine ventilation plan; submission and approval.

    violationRecord 5183756

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  5. Identification of circuit breakers.

    violationRecord 5183755

    30 CFR 75.904 · $177.00 proposed penalty

  6. Electric equipment; examination, testing and maintenance.

    violationRecord 5183754

    30 CFR 75.512 · $151.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 5183753

    30 CFR 75.400 · $151.00 proposed penalty

  8. Permissible electric face equipment; maintenance.

    violationRecord 5183752

    30 CFR 75.503 · $151.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 5186371

    30 CFR 75.370(a)(1) · $209.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 5186370

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  11. Mine ventilation plan; submission and approval.

    violationRecord 5186369

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5183751

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  13. Drill dust control at underground areas of underground mines.

    violationRecord 5183750

    30 CFR 72.630(b) · $151.00 proposed penalty

  14. Permissible electric face equipment; maintenance.

    violationRecord 5183749

    30 CFR 75.503 · $151.00 proposed penalty

  15. Permissible electric face equipment; maintenance.

    violationRecord 5183747

    30 CFR 75.503 · $151.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 5183746

    30 CFR 75.400 · $151.00 proposed penalty

  17. Drill dust control at underground areas of underground mines.

    violationRecord 5183745

    30 CFR 72.630(b) · $151.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5183744

    30 CFR 75.400 · $151.00 proposed penalty

  19. Permissible electric face equipment; maintenance.

    violationRecord 5183743

    30 CFR 75.503 · $151.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5183742

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  21. Regular Safety and Health Inspection

    inspectionRecord F00ACDE

    85.3 on-site hours reported

  22. Spot Inspection

    inspectionRecord F00C0B9

    7.0 on-site hours reported

  23. Spot Inspection

    inspectionRecord F00CD03

    3.3 on-site hours reported

  24. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5029120

    30 CFR 77.1606(c) · $151.00 proposed penalty

  25. Regular Safety and Health Inspection

    inspectionRecord F014285

    17.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.