Magnum #2 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
14.5 on-site hours reported
Special Emphasis Programs
3.3 on-site hours reported
Mine emergency evacuation training and drills.
30 CFR 75.1504(d) · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
30 CFR 75.1103-8(c) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Multi-gas detectors.
30 CFR 75.1714-7(c) · $151.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(b) · Significant and substantial (S&S) · $432.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(b) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $193.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
Sampling; general and technical requirements.
30 CFR 70.201(e) · $151.00 proposed penalty
Non-Injury Accident Investigation
8.5 on-site hours reported
Violation — cited standard not reported
Spot Inspection
8.0 on-site hours reported
Inspection and cover plates.
30 CFR 77.512 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $313.00 proposed penalty
Regular Safety and Health Inspection
130.0 on-site hours reported
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Warning devices.
30 CFR 75.208 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Spot Inspection
24.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.