Lynn Branch No. 2 Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Mechanical equipment guards.
30 CFR 77.400(b) · $336.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $2,712.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $245.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $398.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $2,712.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Automated Temporary Roof Support (ATRS) systems.
30 CFR 75.209(d) · $151.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $336.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Spot Inspections
103(i) · 9.5 on-site hours reported
Cable fittings; suitability.
30 CFR 75.515 · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $366.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c) · $336.00 proposed penalty
Underground electrical installations.
30 CFR 75.340(a) · $336.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $1,219.00 proposed penalty
Other safeguards.
30 CFR 75.1403
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $2,712.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $1,320.00 proposed penalty
Spot Inspections
103(i) · 10.8 on-site hours reported
Installation of high-voltage transmission cables.
30 CFR 75.807 · $1,126.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.