← Lynn Branch No. 2 Mine

Lynn Branch No. 2 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Other safeguards.

    violationRecord 5093035

    30 CFR 75.1403 · $398.00 proposed penalty

  2. Preshift examination at fixed intervals.

    violationRecord 5093034

    30 CFR 75.360(b)(3) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  3. Permissible electric face equipment; maintenance.

    violationRecord 5093033

    30 CFR 75.503 · $336.00 proposed penalty

  4. Roof control plan.

    violationRecord 5093032

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  5. Mine ventilation plan; submission and approval.

    violationRecord 5093031

    30 CFR 75.370(a)(1) · $245.00 proposed penalty

  6. Permissible electric equipment.

    violationRecord 5093030

    30 CFR 75.500(c) · $336.00 proposed penalty

  7. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5093029

    30 CFR 75.1106-3(c) · $504.00 proposed penalty

  8. Preshift examination at fixed intervals.

    violationRecord 5093027

    30 CFR 75.360(g) · $336.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5093026

    30 CFR 75.400 · $642.00 proposed penalty

  10. Other safeguards.

    violationRecord 5093025

    30 CFR 75.1403 · $398.00 proposed penalty

  11. Power wires and cables; insulation and protection.

    violationRecord 5093024

    30 CFR 75.517 · Significant and substantial (S&S) · $3,448.00 proposed penalty

  12. Mechanical equipment guards.

    violationRecord 5093023

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  13. Roof control plan.

    violationRecord 5093022

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5093021

    30 CFR 75.370(a)(1) · $4,047.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5093020

    30 CFR 75.400 · $642.00 proposed penalty

  16. Mechanical equipment guards.

    violationRecord 5093019

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  17. Spot Inspections

    inspectionRecord F013A0A

    103(i) · 6.5 on-site hours reported

  18. Accumulation of combustible materials.

    violationRecord 5093018

    30 CFR 75.400 · $642.00 proposed penalty

  19. Mechanical equipment guards.

    violationRecord 5093017

    30 CFR 75.1722(c) · $504.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5093016

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  21. Other safeguards.

    violationRecord 5093015

    30 CFR 75.1403 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  22. Machinery and equipment; operation and maintenance.

    violationRecord 5093014

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  23. Automatic emergency-parking brakes.

    violationRecord 5093013

    30 CFR 75.523-3(c)(2) · $151.00 proposed penalty

  24. Protection from falls of roof, face and ribs.

    violationRecord 5093012

    30 CFR 75.202(a) · $465.00 proposed penalty

  25. Cable fittings; suitability.

    violationRecord 5093011

    30 CFR 75.515 · $504.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.