← Ludlow Mill

Ludlow Mill safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Temporary, portable containers.

    violationRecord 5073383

    30 CFR 47.44(b) · $151.00 proposed penalty

  2. Construction and maintenance of guards.

    violationRecord 5073382

    30 CFR 56.14112(b) · $151.00 proposed penalty

  3. Protection for openings around travelways.

    violationRecord 5073381

    30 CFR 56.11012 · $151.00 proposed penalty

  4. Horns and backup alarms.

    violationRecord 5073380

    30 CFR 56.14132(b)(1)(i) · $151.00 proposed penalty

  5. Housekeeping.

    violationRecord 5073379

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $592.00 proposed penalty

  6. Construction and maintenance of guards.

    violationRecord 5073378

    30 CFR 56.14112(b) · $177.00 proposed penalty

  7. Safety defects; examination, correction and records.

    violationRecord 5073377

    30 CFR 56.14100(c) · $177.00 proposed penalty

  8. Regular Safety and Health Inspection

    inspectionRecord F0238AB

    54.0 on-site hours reported

  9. Combustible waste.

    violationRecord 5073376

    30 CFR 56.4104(a) · $151.00 proposed penalty

  10. Disorders (repeated trauma)

    accidentRecord 220252550004

    Occupatnal illness not deg 1-6

    Accident narrative

    Audiometric testing was done on 8/06/2025 showing hearing loss.

  11. Compliance Follow-up Inspection

    inspectionRecord F013E9D

    3.0 on-site hours reported

  12. Brakes.

    violationRecord 5071155

    30 CFR 56.14101(a)(2) · $151.00 proposed penalty

  13. Requirement for container labels.

    violationRecord 5070448

    30 CFR 47.41(a) · $151.00 proposed penalty

  14. Protection for openings around travelways.

    violationRecord 5070447

    30 CFR 56.11012 · Significant and substantial (S&S) · $193.00 proposed penalty

  15. Abandoned electric circuits.

    violationRecord 5070446

    30 CFR 56.4011 · $151.00 proposed penalty

  16. Horns and backup alarms.

    violationRecord 5070445

    30 CFR 56.14132(a) · $151.00 proposed penalty

  17. Housekeeping.

    violationRecord 5070444

    30 CFR 56.20003(a) · $151.00 proposed penalty

  18. Housekeeping.

    violationRecord 5070443

    30 CFR 56.20003(a) · $151.00 proposed penalty

  19. Housekeeping.

    violationRecord 5070442

    30 CFR 56.20003(a) · $151.00 proposed penalty

  20. Experienced miner training.

    violationRecord 5070441

    30 CFR 48.26 · $151.00 proposed penalty

  21. Experienced miner training.

    violationRecord 5070440

    30 CFR 48.26 · $168.00 proposed penalty

  22. Inspection.

    violationRecord 5070439

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  23. Horns and backup alarms.

    violationRecord 5070438

    30 CFR 56.14132(a) · $151.00 proposed penalty

  24. Horns and backup alarms.

    violationRecord 5070437

    30 CFR 56.14132(a) · $151.00 proposed penalty

  25. Brakes.

    violationRecord 5070436

    30 CFR 56.14101(a)(2) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.