Lower War Eagle safety activity
MSHA violations, accident reports and inspections.
Safety activity
On-shift examination.
30 CFR 75.362(g)(3) · $151.00 proposed penalty
Spot Inspections
103(i) · 5.5 on-site hours reported
Regular Safety and Health Inspection
63.0 on-site hours reported
Spot Inspections
103(i) · 6.3 on-site hours reported
Spot Inspection
5.3 on-site hours reported
Spot Inspections
103(i) · 4.3 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Records of training.
30 CFR 48.29(c) · $151.00 proposed penalty
Audiometric test procedures.
30 CFR 62.171(c) · $151.00 proposed penalty
Spot Inspections
103(i) · 5.0 on-site hours reported
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $697.00 proposed penalty
Spot Inspections
103(i) · 8.8 on-site hours reported
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Ventilation controls.
30 CFR 75.333(e)(1)(ii) · $165.00 proposed penalty
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
30 CFR 75.1107-1(a)(3)(ii) · $165.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Power wires; support.
30 CFR 75.516 · $165.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $209.00 proposed penalty
Spot Inspections
103(i) · 7.0 on-site hours reported
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $151.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Flammable liquids; storage.
30 CFR 77.1103(d) · $151.00 proposed penalty
Spot Inspections
103(i) · 9.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.