Lower War Eagle safety activity
MSHA violations, accident reports and inspections.
Safety activity
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
30 CFR 75.1103-8(c) · $209.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $267.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $245.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $267.00 proposed penalty
Spot Inspections
103(i) · 4.5 on-site hours reported
Automatic fire sensor and warning device systems; examination and test requirements.
30 CFR 75.1103-8(c) · $151.00 proposed penalty
Communications facilities; refuge alternatives.
30 CFR 75.1600-3(a)(2) · $151.00 proposed penalty
Roof control plan-approval criteria.
30 CFR 75.222(b)(1) · $151.00 proposed penalty
Roof bolting.
30 CFR 75.204(c)(1) · $1,219.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $267.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Spot Inspections
103(i) · 7.5 on-site hours reported
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
Cable fittings; suitability.
30 CFR 75.515 · $245.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $398.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $313.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $398.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $313.00 proposed penalty
Other safeguards.
30 CFR 75.1403
Accumulation of combustible materials.
30 CFR 75.400 · $504.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $432.00 proposed penalty
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
30 CFR 75.1107-1(a)(3)(ii) · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.