  1. Housekeeping.

    violationRecord 9766167

    30 CFR 56.20003(a) · $151.00 proposed penalty

  2. Action level.

    violationRecord 9998176

    30 CFR 62.120 · $193.00 proposed penalty

  3. Permissible exposure level.

    violationRecord 9998175

    30 CFR 62.130(a) · $193.00 proposed penalty

  4. Illumination of surface working areas.

    violationRecord 9766166

    30 CFR 56.17001 · $151.00 proposed penalty

  5. Safety defects; examination, correction and records.

    violationRecord 9998173

    30 CFR 56.14100(b) · $193.00 proposed penalty

  6. Safety defects; examination, correction and records.

    violationRecord 9998172

    30 CFR 56.14100(b) · $151.00 proposed penalty

  7. Housekeeping.

    violationRecord 9998171

    30 CFR 56.20003(b) · $151.00 proposed penalty

  8. Housekeeping.

    violationRecord 9998170

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  9. First-aid materials.

    violationRecord 9766729

    30 CFR 56.15001 · $151.00 proposed penalty

  10. Battery-charging stations.

    violationRecord 9766728

    30 CFR 56.4502(c) · $151.00 proposed penalty

  11. Parking procedures for unattended equipment.

    violationRecord 9766727

    30 CFR 56.14207 · $432.00 proposed penalty

  12. Site-specific hazard awareness training.

    violationRecord 9766726

    30 CFR 46.11(b) · Significant and substantial (S&S) · $7,872.00 proposed penalty

  13. Access to stationary electrical equipment or switchgear.

    violationRecord 9766165

    30 CFR 56.12019 · $432.00 proposed penalty

  14. Housekeeping.

    violationRecord 9766163

    30 CFR 56.20003(b) · $151.00 proposed penalty

  15. Magazine requirements.

    violationRecord 9766162

    30 CFR 56.6132(b) · $151.00 proposed penalty

  16. Safety defects; examination, correction and records.

    violationRecord 9998174

    30 CFR 56.14100(b) · $193.00 proposed penalty

  17. Safe access.

    violationRecord 9998169

    30 CFR 56.11001 · $642.00 proposed penalty

  18. Construction and maintenance of ladders.

    violationRecord 9998168

    30 CFR 56.11003 · $193.00 proposed penalty

  19. Inspection.

    violationRecord 9998167

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  20. Safety defects; examination, correction and records.

    violationRecord 9998166

    30 CFR 56.14100(b) · $193.00 proposed penalty

  21. Safety defects; examination, correction and records.

    violationRecord 9998165

    30 CFR 56.14100(b) · $193.00 proposed penalty

  22. Spillage and leakage.

    violationRecord 9998164

    30 CFR 56.4102 · $151.00 proposed penalty

  23. Safety belts and lines.

    violationRecord 9766725

    30 CFR 56.15005 · Significant and substantial (S&S) · $2,133.00 proposed penalty

  24. Parking procedures for unattended equipment.

    violationRecord 9766723

    30 CFR 56.14207 · $151.00 proposed penalty

  25. Parking procedures for unattended equipment.

    violationRecord 9766722

    30 CFR 56.14207 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.