Louisville Plant Quarry & Mill safety activity
MSHA violations, accident reports and inspections.
Safety activity
Moving machine parts.
30 CFR 56.14107(a) · $336.00 proposed penalty
Inspection.
30 CFR 56.4201(a)(2) · $226.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $2,133.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · Significant and substantial (S&S) · $3,736.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $755.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $2,503.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $2,503.00 proposed penalty
Requirement for container labels.
30 CFR 47.41(a) · $151.00 proposed penalty
Spillage and leakage.
30 CFR 56.4102 · $151.00 proposed penalty
Barricades and warning signs.
30 CFR 56.20011 · $398.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $11,450.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $2,936.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $2,936.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $1,037.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $3,448.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $2,312.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $2,936.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $2,312.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $1,219.00 proposed penalty
Warning signs.
30 CFR 56.4101 · $313.00 proposed penalty
Eye protection when operating grinding wheels.
30 CFR 56.15014 · $151.00 proposed penalty
Safe access.
30 CFR 56.11001 · $642.00 proposed penalty
Regular Safety and Health Inspection
321.5 on-site hours reported
New task training.
30 CFR 46.7(a) · $1,679.00 proposed penalty
Access to stationary electrical equipment or switchgear.
30 CFR 56.12019 · $398.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.