← Louisville Plant Quarry & Mill

Louisville Plant Quarry & Mill safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Identification of power switches.

    violationRecord 5042515

    30 CFR 56.12018 · $642.00 proposed penalty

  2. Temporary, portable containers.

    violationRecord 5042948

    30 CFR 47.44(b) · $288.00 proposed penalty

  3. First-aid materials.

    violationRecord 5042947

    30 CFR 56.15001 · $288.00 proposed penalty

  4. Inspection.

    violationRecord 5042946

    30 CFR 56.4201(a)(2) · $193.00 proposed penalty

  5. Safe access.

    violationRecord 5042945

    30 CFR 56.11001 · Significant and substantial (S&S) · $1,431.00 proposed penalty

  6. Controls and switches.

    violationRecord 5042944

    30 CFR 56.12002 · $288.00 proposed penalty

  7. Danger signs.

    violationRecord 5042943

    30 CFR 56.12021 · $642.00 proposed penalty

  8. Temporary, portable containers.

    violationRecord 5042942

    30 CFR 47.44(b) · $193.00 proposed penalty

  9. Safety defects; examination, correction and records.

    violationRecord 5042941

    30 CFR 56.14100(b) · $432.00 proposed penalty

  10. Electrical conductors.

    violationRecord 5042514

    30 CFR 56.12004 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  11. Inspection and cover plates.

    violationRecord 5042513

    30 CFR 56.12032 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  12. Grounding circuit enclosures.

    violationRecord 5042512

    30 CFR 56.12025 · $642.00 proposed penalty

  13. Testing grounding systems.

    violationRecord 5042511

    30 CFR 56.12028 · $1,550.00 proposed penalty

  14. High-pressure hose connections.

    violationRecord 5042510

    30 CFR 56.13021 · $193.00 proposed penalty

  15. Electrical conductors.

    violationRecord 5042509

    30 CFR 56.12004 · $642.00 proposed penalty

  16. Exposure monitoring.

    violationRecord 5042508

    30 CFR 56.5002 · Significant and substantial (S&S) · $4,749.00 proposed penalty

  17. Electrical conductors.

    violationRecord 5042507

    30 CFR 56.12004 · $642.00 proposed penalty

  18. Electrical conductors.

    violationRecord 5042506

    30 CFR 56.12004 · $642.00 proposed penalty

  19. Testing grounding systems.

    violationRecord 5042505

    30 CFR 56.12028 · $1,550.00 proposed penalty

  20. Controls and switches.

    violationRecord 5042504

    30 CFR 56.12002 · $288.00 proposed penalty

  21. Construction and maintenance of guards.

    violationRecord 5042503

    30 CFR 56.14112(a)(1) · $288.00 proposed penalty

  22. Inspection.

    violationRecord 5211428

    30 CFR 56.4201(a)(2) · $336.00 proposed penalty

  23. Inspection.

    violationRecord 5211427

    30 CFR 56.4201(a)(2) · $336.00 proposed penalty

  24. Safety defects; examination, correction and records.

    violationRecord 5211426

    30 CFR 56.14100(b) · $5,574.00 proposed penalty

  25. Testing grounding systems.

    violationRecord 5211425

    30 CFR 56.12028 · $1,968.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.