LONGVIEW MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Electrical Technical Investigation
5.0 on-site hours reported
Spot Inspections
103(i) · 3.3 on-site hours reported
Spot Inspections
103(i) · 7.5 on-site hours reported
Face ventilation control devices.
30 CFR 75.330(b)(2)
Communications facilities; refuge alternatives.
30 CFR 75.1600-3(a)(2)
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S)
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S)
Accumulation of combustible materials.
30 CFR 75.400
Roof control plan.
30 CFR 75.220(a)(1)
Spot Inspections
103(i) · 8.0 on-site hours reported
Auxiliary fans and tubing.
30 CFR 75.331(a)(4)
Spot Inspections
103(i) · 7.5 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400
Electric equipment; examination, testing and maintenance.
30 CFR 75.512
Condition and examination of firefighting equipment.
30 CFR 75.1100-3
Spot Inspections
103(i) · 10.8 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400
Regular Safety and Health Inspection
35.8 on-site hours reported
Spot Inspections
103(i) · 8.0 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a)
Spot Inspections
103(i) · 6.5 on-site hours reported
Fire
Accident only
Accident narrative
A fire occurred in the gob of the active Headgate 4 longwall panel.
Non-Injury Accident Investigation
944.5 on-site hours reported
Violation — cited standard not reported
Identification check system.
30 CFR 75.1715 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.