Logansport Cement Plant safety activity
MSHA violations, accident reports and inspections.
Safety activity
General requirements.
30 CFR 56.4200(b)(2) · $151.00 proposed penalty
Slip or fall of person
No dys awy frm wrk,no rstr act
Accident narrative
EE slipped and fell on EE's right hip
Verbal Hazard Complaint Inspections
5.8 on-site hours reported
Slip or fall of person
No dys awy frm wrk,no rstr act
Accident narrative
EE was entering the building on EE's way to EE's office when EE tripped on the steps going up to the door. This was on Friday. We considered it first aid. On Tuesday EE went to the Clinic for an X-ray. X-ray showed a fracture in EE's right foot. EE came back with restrictions. This is when it became an MTI and recordable to MSHA
Disorders (physical agents)
Occupatnal illness not deg 1-6
Accident narrative
EE experienced Heat Exhaustion due to temperatures in the 90's range
Housekeeping.
30 CFR 56.20003(a) · $2,503.00 proposed penalty
Horns and backup alarms.
30 CFR 56.14132(a) · $549.00 proposed penalty
General requirements.
30 CFR 56.4200(b)(2) · $549.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $818.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(c) · $549.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $8,315.00 proposed penalty
Distribution boxes.
30 CFR 56.12006 · $549.00 proposed penalty
Junction box connection procedures.
30 CFR 56.12007 · Significant and substantial (S&S) · $2,712.00 proposed penalty
Moving machine parts.
30 CFR 56.14107(a) · Significant and substantial (S&S) · $8,315.00 proposed penalty
Correction of dangerous conditions.
30 CFR 56.12030 · $549.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $549.00 proposed penalty
Regular Safety and Health Inspection
82.8 on-site hours reported
Securing gas cylinders.
30 CFR 56.16005 · $549.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $8,315.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $2,503.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.