← Lively Grove Mine

Lively Grove Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 9781762

    30 CFR 75.400 · $366.00 proposed penalty

  2. Protection of trailing cables.

    violationRecord 5015308

    30 CFR 75.606 · $592.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 5015545

    30 CFR 75.400 · $336.00 proposed penalty

  4. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5015544

    30 CFR 75.1909(a)(1) · $177.00 proposed penalty

  5. Roof control plan.

    violationRecord 5015543

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  6. Roof control plan.

    violationRecord 5015542

    30 CFR 75.220(a)(1) · $883.00 proposed penalty

  7. Permissible electric face equipment; maintenance.

    violationRecord 5015307

    30 CFR 75.503 · Significant and substantial (S&S) · $1,320.00 proposed penalty

  8. Power wires and cables; insulation and protection.

    violationRecord 5015306

    30 CFR 75.517 · Significant and substantial (S&S) · $3,448.00 proposed penalty

  9. Maintenance of diesel-powered equipment.

    violationRecord 5015541

    30 CFR 75.1914(a) · $177.00 proposed penalty

  10. Spot Inspections

    inspectionRecord 4257389

    103(i) · 4.5 on-site hours reported

  11. Permissible electric face equipment; maintenance.

    violationRecord 5015305

    30 CFR 75.503 · $267.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 5015304

    30 CFR 75.503 · $267.00 proposed penalty

  13. Spot Inspections

    inspectionRecord F0110D2

    103(i) · 5.5 on-site hours reported

  14. Protection from falls of roof, face and ribs.

    violationRecord 9548780

    30 CFR 75.202(a) · $336.00 proposed penalty

  15. Roof control plan.

    violationRecord 5015540

    30 CFR 75.220(a)(1) · $288.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 9548778

    30 CFR 75.400 · $366.00 proposed penalty

  17. Protection from falls of roof, face and ribs.

    violationRecord 9548777

    30 CFR 75.202(a) · $336.00 proposed penalty

  18. Roof control plan.

    violationRecord 9548776

    30 CFR 75.220(a)(1) · $288.00 proposed penalty

  19. Electric equipment; examination, testing and maintenance.

    violationRecord 5015539

    30 CFR 75.512 · $267.00 proposed penalty

  20. Rock dusting.

    violationRecord 5015538

    30 CFR 75.402 · $193.00 proposed penalty

  21. Roof control plan.

    violationRecord 5015537

    30 CFR 75.220(a)(1) · $288.00 proposed penalty

  22. Roof control plan.

    violationRecord 5015536

    30 CFR 75.220(a)(1) · $288.00 proposed penalty

  23. Roof control plan.

    violationRecord 5015535

    30 CFR 75.220(a)(1) · $959.00 proposed penalty

  24. Maintenance of diesel-powered equipment.

    violationRecord 5015534

    30 CFR 75.1914(a) · $177.00 proposed penalty

  25. Storage of materials.

    violationRecord 5015533

    30 CFR 77.208(d) · $177.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.