Linwood Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Escapeways and refuges.

    violationRecord 5118895

    30 CFR 57.11050(a) · Significant and substantial (S&S) · $642.00 proposed penalty

  2. Correction of hazardous conditions.

    violationRecord 5118894

    30 CFR 57.3200 · $151.00 proposed penalty

  3. Combustible waste.

    violationRecord 5118893

    30 CFR 57.4104(b)(1) · $432.00 proposed penalty

  4. Access to stationary electrical equipment or switchgear.

    violationRecord 5118892

    30 CFR 57.12019 · $151.00 proposed penalty

  5. Storage of flammable liquids underground.

    violationRecord 5118891

    30 CFR 57.4460(a)(1) · $151.00 proposed penalty

  6. Combustible waste.

    violationRecord 5118890

    30 CFR 57.4104(a) · $151.00 proposed penalty

  7. Moving machine parts.

    violationRecord 5118889

    30 CFR 57.14107(a) · $193.00 proposed penalty

  8. Temporary, portable containers.

    violationRecord 5118888

    30 CFR 47.44(b) · $151.00 proposed penalty

  9. Combustible waste.

    violationRecord 5118887

    30 CFR 57.4104(b)(2) · $432.00 proposed penalty

  10. Identification of power switches.

    violationRecord 5118886

    30 CFR 57.12018 · $193.00 proposed penalty

  11. Overhead drive belts.

    violationRecord 5118885

    30 CFR 57.14108 · $151.00 proposed penalty

  12. Unguarded conveyors with adjacent travelways.

    violationRecord 5118884

    30 CFR 57.14109(b)(1) · $193.00 proposed penalty

  13. Regular Safety and Health Inspection

    inspectionRecord F037BC1

    39.8 on-site hours reported

  14. Compliance Follow-up Inspection

    inspectionRecord F025287

    2.5 on-site hours reported

  15. Safety defects; examination, correction and records.

    violationRecord 5118846

    30 CFR 57.14100(c) · $177.00 proposed penalty

  16. Safety defects; examination, correction and records.

    violationRecord 5118845

    30 CFR 57.14100(b) · $165.00 proposed penalty

  17. General requirements.

    violationRecord 5118844

    30 CFR 57.4200(b)(2) · $151.00 proposed penalty

  18. Procedures during repairs or maintenance.

    violationRecord 5118843

    30 CFR 57.14105 · Significant and substantial (S&S) · $366.00 proposed penalty

  19. Requirement for container labels.

    violationRecord 5118842

    30 CFR 47.41(a) · $151.00 proposed penalty

  20. Identification of power switches.

    violationRecord 5118841

    30 CFR 57.12018 · $151.00 proposed penalty

  21. Construction and maintenance of guards.

    violationRecord 5118840

    30 CFR 57.14112(a)(1) · $151.00 proposed penalty

  22. Regular Safety and Health Inspection

    inspectionRecord F025284

    41.8 on-site hours reported

  23. Compliance Follow-up Inspection

    inspectionRecord F02527D

    1.5 on-site hours reported

  24. Compliance Follow-up Inspection

    inspectionRecord F02527A

    0.8 on-site hours reported

  25. Safety defects; examination, correction and records.

    violationRecord 5118829

    30 CFR 57.14100(c) · Significant and substantial (S&S) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.