Impoundment Spot Inspection
6.0 on-site hours reported
Compliance Follow-up Inspection
5.0 on-site hours reported
Water, sediment, or slurry impoundments and impounding structures; general.
30 CFR 77.216(d)
Water, sediment, or slurry impoundments and impounding structures; general.
30 CFR 77.216(d)
Water, sediment, or slurry impoundments and impounding structures; inspection requirements; correction of hazards; program requirements.
30 CFR 77.216-3(a)(1)
Verbal Hazard Complaint Inspections
8.0 on-site hours reported
Water, sediment, or slurry impoundments and impounding structures; general.
30 CFR 77.216(d) · $168.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(a) · $151.00 proposed penalty
Water, sediment, or slurry impoundments and impounding structures; general.
30 CFR 77.216(d) · $168.00 proposed penalty
Water, sediment, or slurry impoundments and impounding structures; inspection requirements; correction of hazards; program requirements.
30 CFR 77.216-3(a)(1) · $168.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(a)
Water, sediment, or slurry impoundments and impounding structures; general.
30 CFR 77.216(d)
Impoundment Spot Inspection
9.8 on-site hours reported
Travelways at surface installations.
30 CFR 77.205(a) · Significant and substantial (S&S) · $168.00 proposed penalty
Water, sediment, or slurry impoundments and impounding structures; general.
30 CFR 77.216(d) · $168.00 proposed penalty
Verbal Hazard Complaint Inspections
5.5 on-site hours reported
Regular Safety and Health Inspection
3.0 on-site hours reported
Water, sediment or slurry impoundments and impounding structures; reporting requirements; certification.
30 CFR 77.216-4(a)
Impoundment Spot Inspection
4.0 on-site hours reported
Water, sediment or slurry impoundments and impounding structures; reporting requirements; certification.
30 CFR 77.216-4(a) · $168.00 proposed penalty
Water, sediment, or slurry impoundments and impounding structures; inspection requirements; correction of hazards; program requirements.
30 CFR 77.216-3(a)(2) · $151.00 proposed penalty
Water, sediment, or slurry impoundments and impounding structures; general.
30 CFR 77.216(d)
Water, sediment, or slurry impoundments and impounding structures; general.
30 CFR 77.216(d)
Water, sediment, or slurry impoundments and impounding structures; general.
30 CFR 77.216(d)
Water, sediment, or slurry impoundments and impounding structures; general.
30 CFR 77.216(d) · $168.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.