← Lexington Quarry

Lexington Quarry safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.

    violationRecord 5083873

    30 CFR 48.3(l)

  2. Regular Safety and Health Inspection

    inspectionRecord F02D6E5

    25.8 on-site hours reported

  3. Surface self-propelled equipment.

    violationRecord 5083872

    30 CFR 57.4230(a)(2)

  4. Fatal Accident Investigation

    inspectionRecord F018C95

    9.0 on-site hours reported

  5. Violation — cited standard not reported

    violationRecord 9775776
  6. Safety defects; examination, correction and records.

    violationRecord 5083676

    30 CFR 57.14100(b) · $151.00 proposed penalty

  7. Regular Safety and Health Inspection

    inspectionRecord F036E4D

    15.8 on-site hours reported

  8. Regular Safety and Health Inspection

    inspectionRecord F0197D4

    14.0 on-site hours reported

  9. Safety defects; examination, correction and records.

    violationRecord 5083612

    30 CFR 57.14100(c) · $151.00 proposed penalty

  10. Protection for openings around travelways.

    violationRecord 5083611

    30 CFR 57.11012 · $151.00 proposed penalty

  11. Berms or guardrails.

    violationRecord 5083597

    30 CFR 57.9300(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  12. Regular Safety and Health Inspection

    inspectionRecord F0197C4

    14.0 on-site hours reported

  13. Brakes.

    violationRecord 5083596

    30 CFR 57.14101(a)(3) · $151.00 proposed penalty

  14. Spot Inspection

    inspectionRecord F00FDE6

    25.0 on-site hours reported

  15. Unguarded conveyors with adjacent travelways.

    violationRecord 9775922

    30 CFR 57.14109(a) · $151.00 proposed penalty

  16. Electrical conductors.

    violationRecord 9775921

    30 CFR 57.12004 · $151.00 proposed penalty

  17. Overhead powerlines.

    violationRecord 9775920

    30 CFR 57.12045 · $151.00 proposed penalty

  18. Regular Safety and Health Inspection

    inspectionRecord F00FF8D

    40.0 on-site hours reported

  19. Spot Inspection

    inspectionRecord 7035898

    2.0 on-site hours reported

  20. Regular Safety and Health Inspection

    inspectionRecord F0258A8

    26.0 on-site hours reported

  21. Safety defects; examination, correction and records.

    violationRecord 9775845

    30 CFR 57.14100(b) · $151.00 proposed penalty

  22. Safety can use.

    violationRecord 9775844

    30 CFR 57.4402 · $151.00 proposed penalty

  23. Regular Safety and Health Inspection

    inspectionRecord F0258A3

    31.0 on-site hours reported

  24. Electrical conductors.

    violationRecord 9775135

    30 CFR 57.12004 · Significant and substantial (S&S) · $288.00 proposed penalty

  25. Moving machine parts.

    violationRecord 9775134

    30 CFR 57.14107(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.