LeLoup Quarry safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Compliance Follow-up Inspection

    inspectionRecord F02736A

    4.8 on-site hours reported

  2. Examination of working places.

    violationRecord 5042752

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  3. Safety defects; examination, correction and records.

    violationRecord 5042751

    30 CFR 56.14100(c) · Significant and substantial (S&S) · $151.00 proposed penalty

  4. Operators stations.

    violationRecord 5042750

    30 CFR 56.14103(b) · $151.00 proposed penalty

  5. Operators stations.

    violationRecord 5042749

    30 CFR 56.14103(b) · $151.00 proposed penalty

  6. Regular Safety and Health Inspection

    inspectionRecord F027368

    17.8 on-site hours reported

  7. Testing grounding systems.

    violationRecord 5042748

    30 CFR 56.12028 · $151.00 proposed penalty

  8. Insulation and fittings for power wires and cables.

    violationRecord 5042747

    30 CFR 56.12008 · $151.00 proposed penalty

  9. Moving machine parts.

    violationRecord 5042746

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $193.00 proposed penalty

  10. Correction of dangerous conditions.

    violationRecord 5042745

    30 CFR 56.12030 · Significant and substantial (S&S) · $432.00 proposed penalty

  11. Insulation and fittings for power wires and cables.

    violationRecord 5042744

    30 CFR 56.12008 · $151.00 proposed penalty

  12. Electrical conductors.

    violationRecord 5042743

    30 CFR 56.12004 · $151.00 proposed penalty

  13. Insulation and fittings for power wires and cables.

    violationRecord 5042742

    30 CFR 56.12008 · $151.00 proposed penalty

  14. Construction and maintenance of guards.

    violationRecord 5042741

    30 CFR 56.14112(b) · $151.00 proposed penalty

  15. Electrical conductors.

    violationRecord 5042740

    30 CFR 56.12004 · $151.00 proposed penalty

  16. Moving machine parts.

    violationRecord 5042739

    30 CFR 56.14107(a) · $151.00 proposed penalty

  17. Construction and maintenance of guards.

    violationRecord 5042738

    30 CFR 56.14112(a) · $151.00 proposed penalty

  18. Electrical conductors.

    violationRecord 5042737

    30 CFR 56.12004 · $151.00 proposed penalty

  19. Identification of power switches.

    violationRecord 5042736

    30 CFR 56.12018 · $151.00 proposed penalty

  20. Inspection and cover plates.

    violationRecord 5042735

    30 CFR 56.12032 · $151.00 proposed penalty

  21. Parking procedures for unattended equipment.

    violationRecord 5042734

    30 CFR 56.14207 · $151.00 proposed penalty

  22. Label contents.

    violationRecord 5042733

    30 CFR 47.42(a) · $151.00 proposed penalty

  23. Label contents.

    violationRecord 5042732

    30 CFR 47.42(a) · $151.00 proposed penalty

  24. Blocking equipment in a raised position.

    violationRecord 5042731

    30 CFR 56.14211(b) · Significant and substantial (S&S) · $432.00 proposed penalty

  25. Safety can use.

    violationRecord 5053832

    30 CFR 56.4402 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.