Leeville safety activity
MSHA violations, accident reports and inspections.
Safety activity
Escape routes.
30 CFR 57.11051(a) · $697.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $1,550.00 proposed penalty
Roadway maintenance.
30 CFR 57.9313 · $313.00 proposed penalty
Refuge areas.
30 CFR 57.11052(d) · $209.00 proposed penalty
Safe access.
30 CFR 57.11001 · $465.00 proposed penalty
Underground alarm systems.
30 CFR 57.4360(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
115.5 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
26.5 on-site hours reported
Delivery to storage or blast site areas.
30 CFR 57.6200 · $465.00 proposed penalty
Machinery
Days restricted activity only
Accident narrative
Ee was using band saw to cut cap hooks. EE's glove got caught in the band saw and cut EE's finger. Seen at ER, laceration was closed with sutures, released with restrictions. Site offering modified duty.
Handtools (nonpowered)
No dys awy frm wrk,no rstr act
Accident narrative
EE was taking a foot off a striker bar and hit a finger with a hammer. EE was seen at clinic, diagnosed with left index finger crush injury, dead skin debrided, finger splinted and must use splint at work. Xrays negative for fracture.
Exposure limits for airborne contaminants.
30 CFR 57.5001(a)/57.5005 · $549.00 proposed penalty
Compliance Follow-up Inspection
4.0 on-site hours reported
Noise exposure assessment.
30 CFR 62.110(d)(2) · $151.00 proposed penalty
Noise exposure assessment.
30 CFR 62.110(d)(2) · $151.00 proposed penalty
Noise exposure assessment.
30 CFR 62.110(d)(2) · $151.00 proposed penalty
Electrical conductors.
30 CFR 57.12004 · $465.00 proposed penalty
Safe access.
30 CFR 57.11001 · $504.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $1,126.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $592.00 proposed penalty
Spillage and leakage.
30 CFR 57.4102 · $288.00 proposed penalty
Spillage and leakage.
30 CFR 57.4102 · $642.00 proposed penalty
Spillage and leakage.
30 CFR 57.4102 · $1,818.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $504.00 proposed penalty
Ground support use.
30 CFR 57.3360 · Significant and substantial (S&S) · $8,315.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.