Leeville safety activity
MSHA violations, accident reports and inspections.
Safety activity
Escape routes.
30 CFR 57.11051(b) · $151.00 proposed penalty
Securing gas cylinders.
30 CFR 57.16005 · $151.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $209.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · $549.00 proposed penalty
Operators' stations.
30 CFR 57.14103(c)(1) · $883.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(2) · $177.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(c) · $4,749.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $592.00 proposed penalty
Examination of working places.
30 CFR 57.18002 · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(a) · $151.00 proposed penalty
Horns and backup alarms for surface equipment.
30 CFR 57.14132 · $313.00 proposed penalty
Underground electric substations and liquid storage facilities.
30 CFR 57.4160(a) · $313.00 proposed penalty
Housekeeping.
30 CFR 57.20003(b) · $336.00 proposed penalty
Barricades and warning signs.
30 CFR 57.20011 · $226.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · $697.00 proposed penalty
Spillage and leakage.
30 CFR 57.4102 · $1,818.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $1,037.00 proposed penalty
Spillage and leakage.
30 CFR 57.4102 · $592.00 proposed penalty
Spillage and leakage.
30 CFR 57.4102 · $592.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $1,037.00 proposed penalty
Housekeeping.
30 CFR 57.20003(b) · $313.00 proposed penalty
Access to stationary electrical equipment or switchgear.
30 CFR 57.12019 · $313.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $1,037.00 proposed penalty
Label contents.
30 CFR 47.42(a) · $313.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $1,679.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.