Leeville safety activity
MSHA violations, accident reports and inspections.
Safety activity
Landings with more than one shaft entrance.
30 CFR 57.19105 · $2,936.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $2,936.00 proposed penalty
Underground shops.
30 CFR 57.4761 · $883.00 proposed penalty
Escape routes.
30 CFR 57.11051(a) · $267.00 proposed penalty
Spot Inspection
2.8 on-site hours reported
Vehicles.
30 CFR 57.6202 · $3,736.00 proposed penalty
Separation of transported explosive material.
30 CFR 57.6201(b)(2) · $3,736.00 proposed penalty
Auxiliary fan systems.
30 CFR 57.8529 · $1,126.00 proposed penalty
Notice of a granted petition for modification.
30 CFR 44.5(b) · $245.00 proposed penalty
Underground shops.
30 CFR 57.4761 · $883.00 proposed penalty
Ventilation Technical Investigation
57.8 on-site hours reported
Heat sources.
30 CFR 57.4500 · $151.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $504.00 proposed penalty
Construction and maintenance of ladders.
30 CFR 57.11003 · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $504.00 proposed penalty
Spillage and leakage.
30 CFR 57.4102 · $288.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $504.00 proposed penalty
Roadway maintenance.
30 CFR 57.9313 · $504.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $226.00 proposed penalty
Electrical conductors.
30 CFR 57.12004 · $465.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $504.00 proposed penalty
Roadway maintenance.
30 CFR 57.9313
Label contents.
30 CFR 47.42 · $1,037.00 proposed penalty
Storage of hazardous materials.
30 CFR 57.16003 · $1,037.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $1,037.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.