Leeville safety activity
MSHA violations, accident reports and inspections.
Safety activity
Special Emphasis Programs
1.0 on-site hours reported
Compliance Follow-up Inspection
8.0 on-site hours reported
Verbal Hazard Complaint Inspections
4.3 on-site hours reported
Splices and repairs of power cables.
30 CFR 57.12013 · $366.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $818.00 proposed penalty
Roadway maintenance.
30 CFR 57.9313 · $1,968.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $1,818.00 proposed penalty
Vehicles.
30 CFR 57.6202(b)(1) · $549.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $1,219.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $1,219.00 proposed penalty
Construction and maintenance of guards.
30 CFR 57.14112(a) · $1,219.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(c) · $313.00 proposed penalty
Underground shops.
30 CFR 57.4761(a) · Significant and substantial (S&S) · $21,713.00 proposed penalty
Underground shops.
30 CFR 57.4761(a)(2)(iii) · $366.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $697.00 proposed penalty
Roadway maintenance.
30 CFR 57.9313 · $267.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $1,219.00 proposed penalty
Splices and repairs of power cables.
30 CFR 57.12013(b) · $549.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $1,219.00 proposed penalty
Housekeeping.
30 CFR 57.20003(b) · $366.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $1,818.00 proposed penalty
Safe access.
30 CFR 57.11001 · $592.00 proposed penalty
Safe access.
30 CFR 57.11001 · $592.00 proposed penalty
Auxiliary fan systems.
30 CFR 57.8529 · $883.00 proposed penalty
Shaft mines.
30 CFR 57.4760(a)(1)(iv) · $549.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.