Leer South Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $3,736.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $1,126.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $336.00 proposed penalty
Spot Inspections
103(i) · 9.0 on-site hours reported
Inspection of fire suppression devices.
30 CFR 75.1107-16(a) · $151.00 proposed penalty
Compressors.
30 CFR 75.344(b) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(f)(3)(ii) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Hoisting
Accident only
Accident narrative
Due to a guide wheel being damaged, the main mine elevator was down more than 30 minutes. No individuals were on the elevator at this time and the elevator was repaired in approximately 40 minutes time. After repair the elevator was tested and put back into service with no further issues.
Spot Inspections
103(i) · 8.0 on-site hours reported
Health Technical Investigation
11.0 on-site hours reported
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Frequency of examinations.
30 CFR 75.512-2 · Significant and substantial (S&S) · $8,315.00 proposed penalty
On-shift examination.
30 CFR 75.362(g)(2)(ii) · $959.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(b)(11)(iii) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $2,503.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $4,871.00 proposed penalty
Protection of trailing cables.
30 CFR 75.606 · $504.00 proposed penalty
Spot Inspections
103(i) · 8.5 on-site hours reported
Spot Inspections
103(i) · 9.5 on-site hours reported
Drill dust control at underground areas of underground mines.
30 CFR 72.630(d) · $818.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $818.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $883.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.