← Leer South Mine

Leer South Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Inundation

    accidentRecord 220261380010

    Accident only

    Accident narrative

    CM cut into an uncharted / unmapped gas well leg on the North Mains section. 0 injuries, 0 ventilation issues, 0 escapeways affected. Gel present and 0 CH4 present.

  2. Spot Inspections

    inspectionRecord F026D22

    103(i) · 9.0 on-site hours reported

  3. Sampling and monitoring requirements.

    violationRecord 9584853

    30 CFR 75.336(a)(1)(i) · $151.00 proposed penalty

  4. Roof Control Technical Investigation

    inspectionRecord F013FCA

    9.5 on-site hours reported

  5. Other safeguards.

    violationRecord 9938620

    30 CFR 75.1403 · $151.00 proposed penalty

  6. Ventilation controls.

    violationRecord 9938464

    30 CFR 75.333(h) · $151.00 proposed penalty

  7. Escapeways; bituminous and lignite mines.

    violationRecord 9938463

    30 CFR 75.380(d)(7)(vi) · $226.00 proposed penalty

  8. Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.

    violationRecord 9938462

    30 CFR 75.363(a) · $504.00 proposed penalty

  9. Roof control plan.

    violationRecord 9938461

    30 CFR 75.220(a)(1) · $504.00 proposed penalty

  10. Spot Inspections

    inspectionRecord F011718

    103(i) · 9.5 on-site hours reported

  11. Roof control plan.

    violationRecord 9938460

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  12. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9938459

    30 CFR 75.1731(b) · $151.00 proposed penalty

  13. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9938619

    30 CFR 75.1731(a) · $151.00 proposed penalty

  14. Spot Inspections

    inspectionRecord F026D21

    103(i) · 6.5 on-site hours reported

  15. Other safeguards.

    violationRecord 9938458

    30 CFR 75.1403 · $226.00 proposed penalty

  16. Preshift examination at fixed intervals.

    violationRecord 9938618

    30 CFR 75.360(b)(11)(iii) · $151.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 9938617

    30 CFR 75.400 · $288.00 proposed penalty

  18. Transporting explosives and detonators.

    violationRecord 9938457

    30 CFR 75.1311(a)(2) · $504.00 proposed penalty

  19. Explosives and detonators in underground magazines.

    violationRecord 9938456

    30 CFR 75.1312(b)(1) · $504.00 proposed penalty

  20. Transporting explosives and detonators.

    violationRecord 9938455

    30 CFR 75.1311(b)(1) · $504.00 proposed penalty

  21. Preshift examination at fixed intervals.

    violationRecord 9938454

    30 CFR 75.360(b)(11)(iii) · $151.00 proposed penalty

  22. Ventilation controls.

    violationRecord 9938453

    30 CFR 75.333(h) · $177.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 9938452

    30 CFR 75.400 · $288.00 proposed penalty

  24. Ventilation controls.

    violationRecord 9938451

    30 CFR 75.333(c) · $226.00 proposed penalty

  25. Spot Inspections

    inspectionRecord F011717

    103(i) · 10.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.