← Leer South Mine

Leer South Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mechanical equipment guards.

    violationRecord 9935172

    30 CFR 75.1722(a) · $366.00 proposed penalty

  2. Spot Inspections

    inspectionRecord F01681D

    103(i) · 8.0 on-site hours reported

  3. Spot Inspections

    inspectionRecord F01681C

    103(i) · 13.3 on-site hours reported

  4. Accumulation of combustible materials.

    violationRecord 9932331

    30 CFR 75.400 · $504.00 proposed penalty

  5. Roof control plan.

    violationRecord 9938493

    30 CFR 75.220(a)(1) · $313.00 proposed penalty

  6. Condition and examination of firefighting equipment.

    violationRecord 9935164

    30 CFR 75.1100-3 · $151.00 proposed penalty

  7. Protection from falls of roof, face and ribs.

    violationRecord 9935163

    30 CFR 75.202(a) · $288.00 proposed penalty

  8. Preshift examination at fixed intervals.

    violationRecord 9938492

    30 CFR 75.360(b) · $818.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 9938491

    30 CFR 75.400 · $1,679.00 proposed penalty

  10. Roof Control Technical Investigation

    inspectionRecord F016739

    10.0 on-site hours reported

  11. Automatic couplers.

    violationRecord 9938490

    30 CFR 75.1405 · $151.00 proposed penalty

  12. Other safeguards.

    violationRecord 9934779

    30 CFR 75.1403 · $336.00 proposed penalty

  13. Escapeways; bituminous and lignite mines.

    violationRecord 9934778

    30 CFR 75.380(d)(4) · $818.00 proposed penalty

  14. Escapeways; bituminous and lignite mines.

    violationRecord 9934777

    30 CFR 75.380(d)(1) · $151.00 proposed penalty

  15. Other safeguards.

    violationRecord 9934776

    30 CFR 75.1403 · $336.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F007A08

    103(i) · 6.3 on-site hours reported

  17. Cable fittings; suitability.

    violationRecord 9932330

    30 CFR 75.515 · $4,047.00 proposed penalty

  18. Handtools (nonpowered)

    accidentRecord 220252240001

    Days away from work only

    Accident narrative

    While cribbing track that was lifted with a jack, employee stepped over track to get a crib when the jack fell causing the rail to impact EE's left calf causing small abrasion and a broken fibula.

  19. Protection from falls of roof, face and ribs.

    violationRecord 9934775

    30 CFR 75.202(a) · $4,749.00 proposed penalty

  20. Ventilation controls.

    violationRecord 9934774

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  21. Other safeguards.

    violationRecord 9934773

    30 CFR 75.1403 · $151.00 proposed penalty

  22. Spot Inspections

    inspectionRecord F007A07

    103(i) · 7.0 on-site hours reported

  23. Accumulation of combustible materials.

    violationRecord 9934772

    30 CFR 75.400 · $504.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 9934771

    30 CFR 75.400 · $226.00 proposed penalty

  25. Spot Inspections

    inspectionRecord F01681B

    103(i) · 7.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.