← Leer South Mine

Leer South Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Permissible electric face equipment; maintenance.

    violationRecord 9587049

    30 CFR 75.503 · Significant and substantial (S&S) · $1,037.00 proposed penalty

  2. Protection from falls of roof, face and ribs.

    violationRecord 9587048

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  3. Spot Inspections

    inspectionRecord F011711

    103(i) · 5.8 on-site hours reported

  4. Ventilation Technical Investigation

    inspectionRecord F0072CD

    13.5 on-site hours reported

  5. Escapeways; bituminous and lignite mines.

    violationRecord 9587047

    30 CFR 75.380(d)(1) · $193.00 proposed penalty

  6. Roof control plan.

    violationRecord 9587046

    30 CFR 75.220(a)(1) · $818.00 proposed penalty

  7. Spot Inspections

    inspectionRecord F011710

    103(i) · 18.0 on-site hours reported

  8. Accumulation of combustible materials.

    violationRecord 9587045

    30 CFR 75.400 · $366.00 proposed penalty

  9. Water sprinkler systems; arrangement of sprinklers.

    violationRecord 9587044

    30 CFR 75.1101-8(a) · $193.00 proposed penalty

  10. Belt air course ventilation.

    violationRecord 9587043

    30 CFR 75.350(a)(2) · $193.00 proposed penalty

  11. Hoisting

    accidentRecord 220260200030

    Accident only

    Accident narrative

    A door switch malfunctioned on the elevator on the landing side in turn caused a fuse to blow. The blown fuse and loss of power caused the VFD to loose its program. Once the switch and fuse were repaired the VFD had to be reprogrammed. There were no individuals on the elevator at any time. The elevator was back in service at 2:18AM.

  12. Machinery

    accidentRecord 220260280003

    Days away from work only

    Accident narrative

    Injured was working on a valve bank while pan line was pushing, toe of boot was down in the connector for the relay bar to the pan. Pinched metatarsal on boot and pinched EE's big toe.

  13. Spot Inspections

    inspectionRecord F026D0E

    103(i) · 9.5 on-site hours reported

  14. Power wires and cables; insulation and protection.

    violationRecord 9938564

    30 CFR 75.517 · Significant and substantial (S&S) · $1,431.00 proposed penalty

  15. Roof control plan.

    violationRecord 9587042

    30 CFR 75.220(a)(1) · $818.00 proposed penalty

  16. Face ventilation control devices.

    violationRecord 9587041

    30 CFR 75.330(a) · $151.00 proposed penalty

  17. Explosives and detonators in underground magazines.

    violationRecord 9938563

    30 CFR 75.1312(e)(1) · $642.00 proposed penalty

  18. Ventilation controls.

    violationRecord 9934204

    30 CFR 75.333(h) · $151.00 proposed penalty

  19. Roof Control Technical Investigation

    inspectionRecord F012920

    15.5 on-site hours reported

  20. Spot Inspections

    inspectionRecord F01170F

    103(i) · 9.5 on-site hours reported

  21. Electric equipment; examination, testing and maintenance.

    violationRecord 9587038

    30 CFR 75.512 · Significant and substantial (S&S) · $336.00 proposed penalty

  22. Cable fittings; suitability.

    violationRecord 9938561

    30 CFR 75.515 · $504.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 9935119

    30 CFR 75.400 · $288.00 proposed penalty

  24. Spot Inspections

    inspectionRecord F01170E

    103(i) · 9.5 on-site hours reported

  25. Regular Safety and Health Inspection

    inspectionRecord F026D0D

    497.3 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.