← LEER MINE

LEER MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Drill dust control at underground areas of underground mines.

    violationRecord 9938267

    30 CFR 72.630(b) · $151.00 proposed penalty

  2. Spot Inspections

    inspectionRecord F016753

    103(i) · 10.0 on-site hours reported

  3. Regular Safety and Health Inspection

    inspectionRecord F018E4F

    264.8 on-site hours reported

  4. Spot Inspections

    inspectionRecord F018E4E

    103(i) · 6.8 on-site hours reported

  5. Accumulation of combustible materials.

    violationRecord 9938266

    30 CFR 75.400 · $336.00 proposed penalty

  6. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9938265

    30 CFR 75.1731(a) · $151.00 proposed penalty

  7. Explosives, handling and use.

    violationRecord 9938262

    30 CFR 77.1303(d) · $151.00 proposed penalty

  8. Machinery and equipment; operation and maintenance.

    violationRecord 9935391

    30 CFR 75.1725(a) · $151.00 proposed penalty

  9. Drill dust control at underground areas of underground mines.

    violationRecord 9935390

    30 CFR 72.630(b) · $151.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 9935389

    30 CFR 75.400 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  11. Criteria—Belt conveyors.

    violationRecord 9935388

    30 CFR 75.1403-5(g) · Significant and substantial (S&S) · $959.00 proposed penalty

  12. Spot Inspections

    inspectionRecord F01996F

    103(i) · 8.3 on-site hours reported

  13. Spot Inspections

    inspectionRecord F018E4C

    103(i) · 6.3 on-site hours reported

  14. Methane monitors.

    violationRecord 9938261

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 9938260

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  16. Other safeguards.

    violationRecord 9938259

    30 CFR 75.1403 · $151.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 9938258

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  18. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 9938257

    30 CFR 75.1911(h) · $151.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 9938256

    30 CFR 75.400 · $151.00 proposed penalty

  20. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9935385

    30 CFR 75.1731(a) · $245.00 proposed penalty

  21. Atmospheric monitoring systems.

    violationRecord 9935384

    30 CFR 75.351(e)(1)(iv) · $642.00 proposed penalty

  22. Other safeguards.

    violationRecord 9935383

    30 CFR 75.1403 · $151.00 proposed penalty

  23. Other safeguards.

    violationRecord 9935382

    30 CFR 75.1403 · $151.00 proposed penalty

  24. Drill dust control at underground areas of underground mines.

    violationRecord 9587122

    30 CFR 72.630(b) · $151.00 proposed penalty

  25. Mine ventilation plan; submission and approval.

    violationRecord 9587121

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.