Leamington Cement Plant safety activity
MSHA violations, accident reports and inspections.
Safety activity
Moving machine parts.
30 CFR 56.14107(a) · $193.00 proposed penalty
Moving machine parts.
30 CFR 56.14107(a) · $193.00 proposed penalty
Warning signs.
30 CFR 56.4101 · $432.00 proposed penalty
Moving machine parts.
30 CFR 56.14107(a) · $432.00 proposed penalty
Handrails and toeboards.
30 CFR 56.11002 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Moving machine parts.
30 CFR 56.14107(a) · $193.00 proposed penalty
Regular Safety and Health Inspection
43.0 on-site hours reported
Machinery
Days restricted activity only
Accident narrative
Two employees were doing dry wall hole repairs. Employees came across an abandoned copper water pipe. One of the employees used a Sawzall to cut the pipe while the other held it in place. While cutting the blade slipped and lacerated three fingers on employees left hand holding the pipe. The employee's pinky finger had the tendon cut and cut into the bone.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.