Laurel Fork Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Electric conductor; capacity and insulation.
30 CFR 75.513 · $1,431.00 proposed penalty
Power wires; support.
30 CFR 75.516 · $818.00 proposed penalty
Atmospheric monitoring systems.
30 CFR 75.351(e)(1)(iv) · $366.00 proposed penalty
Atmospheric monitoring systems.
30 CFR 75.351(c)(4) · $818.00 proposed penalty
Loading and haulage equipment; operation.
30 CFR 77.1607(i) · $267.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · Significant and substantial (S&S) · $959.00 proposed penalty
Protection of trailing cables.
30 CFR 75.606 · $366.00 proposed penalty
On-shift examination.
30 CFR 75.362(d)(2) · $1,320.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · $2,712.00 proposed penalty
Water spray devices; capacity; water supply; minimum requirements.
30 CFR 75.1107-7(b) · $245.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $432.00 proposed penalty
Slippage and sequence switches.
30 CFR 75.1102 · $245.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $9,757.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $366.00 proposed penalty
Cable fittings; suitability.
30 CFR 77.505 · $1,320.00 proposed penalty
Identification of circuit breakers.
30 CFR 77.904 · $245.00 proposed penalty
Stationary grinding machines; protective devices.
30 CFR 77.401(a)(2) · $1,219.00 proposed penalty
Examination and maintenance of firefighting equipment.
30 CFR 77.1110 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(b) · $1,219.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(k) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Atmospheric monitoring systems.
30 CFR 75.351(k) · $151.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.