Laurel Fork Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $818.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $336.00 proposed penalty
Short circuit protection of trailing cables.
30 CFR 75.601 · $1,126.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $504.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $193.00 proposed penalty
Regular Safety and Health Inspection
259.3 on-site hours reported
Spot Inspections
103(i) · 3.5 on-site hours reported
Spot Inspection
5.0 on-site hours reported
Surface installations; general.
30 CFR 77.200 · $336.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(a) · $151.00 proposed penalty
Spot Inspections
103(i) · 4.0 on-site hours reported
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(c) · $336.00 proposed penalty
Spot Inspections
103(i) · 6.0 on-site hours reported
Maintenance and tests of liquefied and nonliquefied compressed gas cylinders; accessories and equipment; requirements.
30 CFR 75.1106-5(a) · $432.00 proposed penalty
Spot Inspections
103(i) · 3.5 on-site hours reported
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iv) · $1,968.00 proposed penalty
Spot Inspections
103(i) · 7.3 on-site hours reported
Regular Safety and Health Inspection
44.0 on-site hours reported
Spot Inspections
103(i) · 5.5 on-site hours reported
Spot Inspection
1.0 on-site hours reported
Status change reports.
30 CFR 70.212(a) · $151.00 proposed penalty
Spot Inspections
103(i) · 7.8 on-site hours reported
Spot Inspections
103(i) · 5.5 on-site hours reported
Spot Inspections
103(i) · 6.0 on-site hours reported
Spot Inspections
103(i) · 4.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.