Lake Hopatcong Quarry safety activity
MSHA violations, accident reports and inspections.
Safety activity
Construction and maintenance of guards.
30 CFR 56.14112(b) · $151.00 proposed penalty
Machinery, equipment, and tools.
30 CFR 56.14205 · Significant and substantial (S&S) · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(c) · $151.00 proposed penalty
Regular Safety and Health Inspection
26.5 on-site hours reported
Barricades and warning signs.
30 CFR 56.20011 · $151.00 proposed penalty
Machinery
Days away from work only
Accident narrative
Employee was drilling concrete and cleaning holes to install studs. Concrete dust got in face and eyes.
Regular Safety and Health Inspection
17.5 on-site hours reported
Safety defects; examination, correction and records.
30 CFR 56.14100(a) · $151.00 proposed penalty
Brakes.
30 CFR 56.14101(a)(3) · $151.00 proposed penalty
Slip or fall of person
Dys awy frm wrk & restrctd act
Accident narrative
Worker was climbing a step ladder when it shifted out from underneath them causing them to grab the catwalk with their left hand which caused a severe muscle strain to their left shoulder.
Regular Safety and Health Inspection
1.0 on-site hours reported
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · Significant and substantial (S&S) · $592.00 proposed penalty
Berms or guardrails.
30 CFR 56.9300(b) · $151.00 proposed penalty
Requirement for container labels.
30 CFR 47.41(a) · $151.00 proposed penalty
Moving machine parts.
30 CFR 56.14107(a) · $151.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $151.00 proposed penalty
Pit or quarry wall perimeter.
30 CFR 56.3131 · $151.00 proposed penalty
Regular Safety and Health Inspection
15.5 on-site hours reported
Brakes.
30 CFR 56.14101(a)(2) · $151.00 proposed penalty
Regular Safety and Health Inspection
19.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.