  1. Compliance Follow-up Inspection

    inspectionRecord F0505A2

    0.0 on-site hours reported

  2. Spillage and leakage.

    violationRecord 5119182

    30 CFR 56.4102

  3. Regular Safety and Health Inspection

    inspectionRecord F05059F

    13.8 on-site hours reported

  4. Protection of persons at switchgear.

    violationRecord 5119181

    30 CFR 56.12020

  5. Safety defects; examination, correction and records.

    violationRecord 5119180

    30 CFR 56.14100(c)

  6. Electrical conductors.

    violationRecord 5119179

    30 CFR 56.12004

  7. Spot Inspection

    inspectionRecord F044603

    5.0 on-site hours reported

  8. Construction and maintenance of guards.

    violationRecord 5118188

    30 CFR 56.14112(b) · $151.00 proposed penalty

  9. Construction and maintenance of guards.

    violationRecord 5118187

    30 CFR 56.14112(b) · $151.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord F033712

    8.5 on-site hours reported

  11. Electrical conductors.

    violationRecord 5118105

    30 CFR 56.12004 · $151.00 proposed penalty

  12. Barricades and warning signs.

    violationRecord 5118104

    30 CFR 56.20011 · $151.00 proposed penalty

  13. Regular Safety and Health Inspection

    inspectionRecord F01B876

    7.0 on-site hours reported

  14. Spot Inspection

    inspectionRecord F01E34F

    5.5 on-site hours reported

  15. Regular Safety and Health Inspection

    inspectionRecord F01BBD8

    10.3 on-site hours reported

  16. Temporary, portable containers.

    violationRecord 9697217

    30 CFR 47.44(b) · $151.00 proposed penalty

  17. Moving machine parts.

    violationRecord 9697216

    30 CFR 56.14107(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.