Kremlin Plant safety activity
MSHA violations, accident reports and inspections.
Safety activity
Machinery
No dys awy frm wrk,no rstr act
Accident narrative
Employee was grinding on a cracked I-beam to prep for welding. EE was wearing a welding hood/face shield and safety glasses. Some grinding dust breached EE's PPE. EE used the available eye wash. A few hours later while at home EE was experiencing eye pain and went to the ER for evaluation. Was given Erythromycin Ointment and referred to a Eye Doctor for debridement.
Impoundment Spot Inspection
1.8 on-site hours reported
Testing grounding systems.
30 CFR 56.12028 · $226.00 proposed penalty
Identification of power switches.
30 CFR 56.12018 · $151.00 proposed penalty
Requirement for container labels.
30 CFR 47.41(a) · $151.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $151.00 proposed penalty
Inspection.
30 CFR 56.4201(a)(2) · $151.00 proposed penalty
Regular Safety and Health Inspection
40.0 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
9.5 on-site hours reported
Housekeeping.
30 CFR 56.20003(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $549.00 proposed penalty
Flying or falling materials.
30 CFR 56.14110 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $818.00 proposed penalty
Flying or falling materials.
30 CFR 56.14110 · $549.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(b) · Significant and substantial (S&S) · $549.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $549.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
10.5 on-site hours reported
Testing grounding systems.
30 CFR 56.12028 · $465.00 proposed penalty
Scaffolds and working platforms.
30 CFR 56.11027 · $5,144.00 proposed penalty
Identification of power switches.
30 CFR 56.12018 · $209.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $209.00 proposed penalty
Access to stationary electrical equipment or switchgear.
30 CFR 56.12019 · $209.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $465.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $465.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $465.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.