  1. Safe access.

    violationRecord 5083445

    30 CFR 56.11001 · $151.00 proposed penalty

  2. Horns and backup alarms.

    violationRecord 5083444

    30 CFR 56.14132(a) · $151.00 proposed penalty

  3. Horns and backup alarms.

    violationRecord 5083624

    30 CFR 56.14132(a) · $151.00 proposed penalty

  4. Use of compressed air.

    violationRecord 5083623

    30 CFR 56.13020 · Significant and substantial (S&S) · $226.00 proposed penalty

  5. Access to stationary electrical equipment or switchgear.

    violationRecord 5083622

    30 CFR 56.12019 · $151.00 proposed penalty

  6. Exits.

    violationRecord 5083621

    30 CFR 56.4530 · $336.00 proposed penalty

  7. Weatherproof lamp sockets.

    violationRecord 5083620

    30 CFR 56.12035 · Significant and substantial (S&S) · $226.00 proposed penalty

  8. Grounding circuit enclosures.

    violationRecord 5083619

    30 CFR 56.12025 · $151.00 proposed penalty

  9. General instructions for completing MSHA Form 7000-1.

    violationRecord 5083618

    30 CFR 50.20-1 · $151.00 proposed penalty

  10. Moving machine parts.

    violationRecord 5083443

    30 CFR 56.14107(a) · $336.00 proposed penalty

  11. Inspection and cover plates.

    violationRecord 5083442

    30 CFR 56.12032 · $151.00 proposed penalty

  12. Safe access.

    violationRecord 9776095

    30 CFR 56.11001 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  13. Safe access.

    violationRecord 9776094

    30 CFR 56.11001 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  14. Testing grounding systems.

    violationRecord 9776093

    30 CFR 56.12028 · $336.00 proposed penalty

  15. Moving machine parts.

    violationRecord 5083441

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  16. Safe access.

    violationRecord 5083617

    30 CFR 56.11001 · Significant and substantial (S&S) · $288.00 proposed penalty

  17. Identification of power switches.

    violationRecord 5083616

    30 CFR 56.12018 · $151.00 proposed penalty

  18. Correction of dangerous conditions.

    violationRecord 5083615

    30 CFR 56.12030 · $151.00 proposed penalty

  19. Identification of power switches.

    violationRecord 5083614

    30 CFR 56.12018 · $151.00 proposed penalty

  20. Access to stationary electrical equipment or switchgear.

    violationRecord 5083613

    30 CFR 56.12019 · $151.00 proposed penalty

  21. Housekeeping.

    violationRecord 9776092

    30 CFR 56.20003(a) · $883.00 proposed penalty

  22. Safety defects; examination, correction and records.

    violationRecord 9776091

    30 CFR 56.14100(b) · $366.00 proposed penalty

  23. Distribution boxes.

    violationRecord 9776090

    30 CFR 56.12006 · $432.00 proposed penalty

  24. Inspection and cover plates.

    violationRecord 9775889

    30 CFR 56.12032 · $432.00 proposed penalty

  25. Housekeeping.

    violationRecord 9775888

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $4,383.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.