← Knoxville Cement Plant

Knoxville Cement Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F02346F

    7.3 on-site hours reported

  2. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5088827

    30 CFR 50.30(a) · $151.00 proposed penalty

  3. Safety defects; examination, correction and records.

    violationRecord 5088826

    30 CFR 56.14100(b) · $151.00 proposed penalty

  4. Inspection.

    violationRecord 5088825

    30 CFR 56.4201(a)(1) · $151.00 proposed penalty

  5. Brakes.

    violationRecord 5088823

    30 CFR 56.14101(a)(1) · $151.00 proposed penalty

  6. Inspection.

    violationRecord 5088822

    30 CFR 56.4201(a)(1) · $151.00 proposed penalty

  7. Safety defects; examination, correction and records.

    violationRecord 5088620

    30 CFR 56.14100(b) · $151.00 proposed penalty

  8. Inspection.

    violationRecord 5088821

    30 CFR 56.4201(a)(1) · $151.00 proposed penalty

  9. Brakes.

    violationRecord 5088820

    30 CFR 56.14101(a)(1)

  10. Distribution boxes.

    violationRecord 5088619

    30 CFR 56.12006 · $151.00 proposed penalty

  11. Brakes.

    violationRecord 5088618

    30 CFR 56.14101(a)(1) · $151.00 proposed penalty

  12. Testing grounding systems.

    violationRecord 5080270

    30 CFR 56.12028 · $151.00 proposed penalty

  13. Safety defects; examination, correction and records.

    violationRecord 5080065

    30 CFR 56.14100(b) · $151.00 proposed penalty

  14. Work on power circuits.

    violationRecord 5080064

    30 CFR 56.12017 · $151.00 proposed penalty

  15. Work on power circuits.

    violationRecord 5080063

    30 CFR 56.12017 · Significant and substantial (S&S) · $151.00 proposed penalty

  16. Guarding trolley wires and bare powerlines.

    violationRecord 5080062

    30 CFR 56.12066 · $151.00 proposed penalty

  17. Safety defects; examination, correction and records.

    violationRecord 5080061

    30 CFR 56.14100(b) · Significant and substantial (S&S) · $504.00 proposed penalty

  18. Operators stations.

    violationRecord 9774089

    30 CFR 56.14103(c)(1) · $151.00 proposed penalty

  19. Regular Safety and Health Inspection

    inspectionRecord F0059ED

    146.3 on-site hours reported

  20. Protection of gas cylinder valves.

    violationRecord 5087019

    30 CFR 56.16006 · $151.00 proposed penalty

  21. Safety belts and lines.

    violationRecord 5087018

    30 CFR 56.15005 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  22. Inspection and cover plates.

    violationRecord 5087414

    30 CFR 56.12032 · $151.00 proposed penalty

  23. Inspection and cover plates.

    violationRecord 5087413

    30 CFR 56.12032 · $151.00 proposed penalty

  24. Construction and maintenance of guards.

    violationRecord 5087412

    30 CFR 56.14112(b) · $151.00 proposed penalty

  25. General requirements.

    violationRecord 5087017

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.