← Knapp Pit

Knapp Pit safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F04115F

    6.0 on-site hours reported

  2. Insulation and fittings for power wires and cables.

    violationRecord 5111235

    30 CFR 56.12008 · $245.00 proposed penalty

  3. Compliance Follow-up Inspection

    inspectionRecord F02F4FB

    3.5 on-site hours reported

  4. Compliance Follow-up Inspection

    inspectionRecord F01FB9B

    2.0 on-site hours reported

  5. Insulation and fittings for power wires and cables.

    violationRecord 9697520

    30 CFR 56.12008 · $151.00 proposed penalty

  6. Examination of working places.

    violationRecord 9697519

    30 CFR 56.18002 · Significant and substantial (S&S) · $549.00 proposed penalty

  7. Horns and backup alarms.

    violationRecord 9697518

    30 CFR 56.14132(b) · Significant and substantial (S&S) · $165.00 proposed penalty

  8. Fuel lines.

    violationRecord 9697517

    30 CFR 56.4501 · $151.00 proposed penalty

  9. Warning signs.

    violationRecord 9697516

    30 CFR 56.4101 · $151.00 proposed penalty

  10. Conveyor start-up warnings.

    violationRecord 9697515

    30 CFR 56.14201(a) · Significant and substantial (S&S) · $165.00 proposed penalty

  11. Moving machine parts.

    violationRecord 9697514

    30 CFR 56.14107(a) · $151.00 proposed penalty

  12. Moving machine parts.

    violationRecord 9697513

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $549.00 proposed penalty

  13. Moving machine parts.

    violationRecord 9697512

    30 CFR 56.14107(a) · $151.00 proposed penalty

  14. Moving machine parts.

    violationRecord 9697511

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $165.00 proposed penalty

  15. Safety defects; examination, correction and records.

    violationRecord 9697510

    30 CFR 56.14100(b) · $151.00 proposed penalty

  16. Moving machine parts.

    violationRecord 9697509

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $165.00 proposed penalty

  17. Moving machine parts.

    violationRecord 9697508

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $165.00 proposed penalty

  18. Moving machine parts.

    violationRecord 9697507

    30 CFR 56.14107(a) · $151.00 proposed penalty

  19. Moving machine parts.

    violationRecord 9697506

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $549.00 proposed penalty

  20. Moving machine parts.

    violationRecord 9697505

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $549.00 proposed penalty

  21. Moving machine parts.

    violationRecord 9697504

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $549.00 proposed penalty

  22. Moving machine parts.

    violationRecord 9697503

    30 CFR 56.14107(a) · $151.00 proposed penalty

  23. Moving machine parts.

    violationRecord 9697502

    30 CFR 56.14107(a) · $151.00 proposed penalty

  24. Barricades and warning signs.

    violationRecord 9697501

    30 CFR 56.20011 · $151.00 proposed penalty

  25. Regular Safety and Health Inspection

    inspectionRecord F02699B

    24.3 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.