Compliance Follow-up Inspection
2.0 on-site hours reported
General requirements.
30 CFR 56.4200(b)(2) · $151.00 proposed penalty
Stationary grinding machines.
30 CFR 56.14115(a) · Significant and substantial (S&S) · $193.00 proposed penalty
Regular Safety and Health Inspection
5.0 on-site hours reported
Examination of ground conditions.
30 CFR 56.3401
Handling of materials
No dys awy frm wrk,no rstr act
Accident narrative
EE's working at base of high wall drilling. They finished drilling and took air lines off and water lines, started packing up equipment. The crane operator then started to pull up air lines and water lines by hand when the airline hit a piece of loose stone due to heat. The piece fell hitting EE.
Non-Fatal Accident Investigation
2.5 on-site hours reported
Examination of ground conditions.
30 CFR 56.3401 · Significant and substantial (S&S)
Regular Safety and Health Inspection
8.0 on-site hours reported
Access to stationary electrical equipment or switchgear.
30 CFR 56.12019 · $151.00 proposed penalty
Warning signs.
30 CFR 56.4101 · $151.00 proposed penalty
Compliance Follow-up Inspection
3.5 on-site hours reported
Written safety program.
30 CFR 56.23002(a)
Examinations.
30 CFR 56.19023(a) · $151.00 proposed penalty
Written safety program.
30 CFR 56.23002(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
14.3 on-site hours reported
Regular Safety and Health Inspection
6.3 on-site hours reported
Electrical conductors.
30 CFR 56.12004 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.